Tseung Kwan O - Cross Bay Link

Cross Bay Link, Tseung Kwan O

Font Size: S | M | L | Site Map | Desktop Version | English | 繁體 | 简体

Project Background

The Cross Bay Link is a dual two-lane carriageway of approximately 1.8 kilometres long with cycle track and footpath across the Junk Bay connecting Tseung Kwan O – Lam Tin Tunnel (currently under construction) and Wan Po Road in Area 86 of TKO. The Cross Bay Link in conjunction with the Tseung Kwan O – Lam Tin Tunnel will relief the busy traffic of the existing Tseung Kwan O Tunnel and its connecting road network.

Project Management:

Civil Engineering and Development Department

Consulting Engineers:

AECOM Asia Co. Ltd.

Project Progress:

Detailed design was substantially completed in end 2017

Investigation and Preliminary Design:

From early 2009 to mid 2014

Detailed Design:

From end 2014 to end 2017